Weak power system bridge and pipeline system
?
In electrical engineering, where cables need to be laid, pipelines for cables need to be laid, and theWeak power systemis no exception.
Weak power system pipeline is the pipe, groove, well and other pipeline systems used by weak power system, which is mainly divided into indoorweak power pipeline systemand outdoor weak power pipeline system.
Indoor weak power pipeline system is mainly composed of weak power pipe (PVC pipe or galvanized steel pipe), weak power trunking (Galvanized trunking or PVC trunking) and weak power pipe well;
The outdoor weak power pipeline is mainly composed of weak power well (manhole or handhole) and weak power routing pipeline.
Weak power bridge system
Schematic diagram of bridge
Cable tray refers to cable ladder, cable tray and metal trunking. Cable trays are mainly made of steel, aluminum alloy and FRP.
The surface treatment of steel bridge is divided into painting, plastic spraying, electro galvanizing, hot galvanizing, powder electrostatic spraying and other processes. The weak current system adopts galvanized metal trunking.
Ground weak power pipeline system
Weak power ground pipeline system of a project office
The ground wiring system is composed of trunking, junction box, junction box, outlet box, various connectors, seals, trunking installation accessories and power head.
?
Outdoor weak power pipeline system
?Routing of weak power pipeline
- Some special environments require overhead wiring, such as factories or oil terminals.
- Outdoor pipelines extend from the center to all corners of the building to meet the requirements of buildingNetwork system、network cabling system、monitoring system、all-in-one card system.、Alarm system、Public Address System, building control system and other systems requiring outdoor pipeline laying.
- The route of weak power pipeline is generally selected on the main road or grassland of the building.
- It is suitable for sharing pipes and slots with CATV network and telecom network. And strong current pipelines shall be constructed separately to avoid interference.
Weak power bridge shall be separated from strong power bridge
Design
Different industries and enterprises are facing different problems of weak power pipeline system. Put your need of power current pipeline system project construction or othersWeak power systemSubmit your requirements for the construction of weak power system project, and we will reply to you by phone or email within 1 working day. If you need help urgently, please call 13585666886.